General :
•
- Renewable Energy Source, no fear of depleting fuel.
•
- Minimum expected availability - 95 %
•
- Environment Friendly
–
- No Pollution
–
- Requires minimum Submergence (for Run-off river projects)
•
- Multipurpose projects are possible i.e, irrigation, flood control, fishery, Tourism, etc. apart from Power Generation
•
- Smaller capacity project feasible (unlike economy of scale to be considered for thermal Project)
O & M aspects :
• Peak load Plant • Part load operation is possible- with reasonable higher efficiency (in the range of 75-85 %)
• Low Operating and Maintenance Cost
•Requires very less auxiliaries system as compared to Thermal Power Projects.
No comments:
Post a Comment